Phase II of this CMGC project includes approximately 58,400 LF of High Density Polyethylene (HDPE) pipe 22-inch in diameter, as well as a culinary water line and a 2 MG water tank. Work also includes turn-out vaults, drains, and air/vacuum valves, in addition to excavation, traffic control, utilities, and a steep grade. Property improvements include 30,000 SF of Asphalt repair, seeding, and fence repair.