This project consisted of installing approximately 67,800 LF of 30 inch HDPE pipe, 12,600 LF of 24-inch HDPE pipe, 6,100 LF of 22-inch HDPE pipe, (17) 30-inch to 22-inch butterfly valve vaults, and (49) 3-inch to 8-inch diameter Combination Air or Air/Vacuum Valves.

Work required crossing canals and the Duchesne River as well as crossing state highway and county roads with boring or directional drills. Additional work included road repair, fence repairs, seeding, and related work. This project was completed in early 2015.