McFarland Solar Phase B

McFarland Solar Phase B: This project for AES included site preparation for a 300 MW [...]

Meridian Solar Farm

Located near Meridian, MS, this 560-acre solar site included 1.2 million CY of earthmoving and [...]

Milford Solar Farm

This civil site work project included clearing and leveling of 747 acres, 59,000 cubic yards [...]

Aviator Wind Farm

This 450MW wind farm was constructed outside of San Angelo, TX. First on the job [...]

Jordanelle Dam Hydroelectric Plant

Central Utah Water Conservancy District commissioned W.W. Clyde & Co. in September 2006 to construct [...]

Pioneer Wind Farm

This project installed 46 EA 1.8 MW General Electric 80M turbines in 8 months. The [...]

Chino Valley Solar

Chino Valley Solar is a 20MW solar plant constructed in the midst of 235 acres [...]

Currant Creek Power Plant

WW Clyde performed the site work for this power plant located in Mona, Utah [...]