McFarland Solar Phase B
McFarland Solar Phase B: This project for AES included site preparation for a 300 MW [...]
Dec
Meridian Solar Farm
Located near Meridian, MS, this 560-acre solar site included 1.2 million CY of earthmoving and [...]
May
Milford Solar Farm
This civil site work project included clearing and leveling of 747 acres, 59,000 cubic yards [...]
Oct
Aviator Wind Farm
This 450MW wind farm was constructed outside of San Angelo, TX. First on the job [...]
May
Jordanelle Dam Hydroelectric Plant
Central Utah Water Conservancy District commissioned W.W. Clyde & Co. in September 2006 to construct [...]
Aug
Pioneer Wind Farm
This project installed 46 EA 1.8 MW General Electric 80M turbines in 8 months. The [...]
Aug
Chino Valley Solar
Chino Valley Solar is a 20MW solar plant constructed in the midst of 235 acres [...]
May
Currant Creek Power Plant
WW Clyde performed the site work for this power plant located in Mona, Utah [...]
Oct