Hamp Regional
- Owner: Hopi Utilities Corporation
- Location: Hopi Reservation, Arizona
- Completion Date: 1 Mar 2022
- Core Competencies: Earthwork, Structural Concrete, Pipelines & Drainage
Related Projects
This project includes 40 miles of water transmission piping, primarily HDPE, ranging in size from 8-inch to 12-inch diameter. Other features include four at-grade welded steel water storage tanks, site development for two wells including CMU block well house buildings, and three skid-mounted booster stations including CMU block buildings. Mechanical work includes altitude, pressure reducing, and flow meter valve vaults, as well as a system-wide supervisory control and data acquisition system, and associated electrical improvements.