Sixth Water Flow Control Structure Modifications
- Owner: Central Utah Water Conservancy District
- Location: Sixth Water Canyon, Utah
- Completion Date: 1 Mar 2022
- Core Competencies: Structural Concrete, Pipelines & Drainage
Related Projects
This project consists of furnishing and installing a high pressure and high head break bypass flow control structure and reconstruction of an 87-inch diameter tunnel access pipeline. The project primarily includes earthwork, structural, mechanical, piping, and electrical work for a new bypass flow control structure that will be connected adjacent to the existing structure. The site is constrained and located in a remote area in Sixth Water Canyon.