Three Creeks Dam Rehabilitation
- Core Competencies:
Related Projects
This project required demolition and removal of existing outlet structure, existing valve, and other tunnelshaft demolition work. The Three Creeks Dam Rehabilitation job proved to be a challenging project due to the elevation and remote location.Work included:
- Removal of existing downstream drain pipes
- New concrete outlet structure was constructed
- New earthen downstream berm, drain blanket and toe drain, an emergency spillway channel shotcrete soil nail wall and fuse plug, and 30-foot deep bedrock relief wells with associated drain piping
- Raised the existing dam crest by 1.5 feet
- 300 lineal feet of fused 36-inch HDPE pipe, 3500 cubic yards of reservoir embankment, 200 lineal feet of liner in a tunnel, and 10,000 cubic feet of excavation