Cottonwood Mine Reclamation
The Cottonwood Mine reclamation project consisted of restoring the original lines and grades of the [...]
12
Feb
Feb
Kessler Canyon Tunnel Rehabilitation
This project consisted of the rehabilitation of the Kessler Canyon Tunnel at the Kennecott Utah [...]
21
Aug
Aug
Materion Monitor Phase I
This strip mining project involved stripping and stockpiling 30,000 cubic yards of topsoil and the [...]
21
Aug
Aug
Brush Rainbow Phase I
This strip mining project involved stripping and stockpiling 25,000 cubic yards of topsoil and the [...]
21
Aug
Aug
Brush Fluro Phase I
This strip mining project involved excavation of 1.5 million cubic yards of alluvium and rhyolite [...]
21
Aug
Aug
Kennecott Utah Copper Projects
Kennecott Utah Copper Projects Smelter Kessler Tunnel • 8,000 cubic yards of concrete using a [...]
21
Aug
Aug
South Wind Phase II
WW Clyde & Co. utilized scrapers and rock trucks to strip 3.29 million cubic yards [...]
21
Aug
Aug