Cottonwood Mine Reclamation

The Cottonwood Mine reclamation project consisted of restoring the original lines and grades of the [...]

Kessler Canyon Tunnel Rehabilitation

This project consisted of the rehabilitation of the Kessler Canyon Tunnel at the Kennecott Utah [...]

Materion Monitor Phase I

This strip mining project involved stripping and stockpiling 30,000 cubic yards of topsoil and the [...]

Brush Rainbow Phase I

This strip mining project involved stripping and stockpiling 25,000 cubic yards of topsoil and the [...]

Brush Fluro Phase I

This strip mining project involved excavation of 1.5 million cubic yards of  alluvium  and rhyolite [...]

Kennecott Utah Copper Projects

Kennecott Utah Copper Projects Smelter Kessler Tunnel    • 8,000 cubic yards of concrete using a [...]

South Wind Phase II

WW Clyde & Co. utilized scrapers and rock trucks to strip 3.29 million cubic yards [...]