Work consisted of the demolition of 6’ thick CSA bank slope protection, coordinated excavation to allow shoring and dewatering to happen concurrently with the mass excavation, foundation prep, and coordination with ADWR. Processing on-site soils to make suitable structural fill for the project. Backfill of all structures and fine grading of the area downstream of the new dam.