On this project, W.W. Clyde & Co. installed 60-inch and 72-inch diameter welded steel pipes and associated facilities including a meter vault, man way access vaults, concrete blow-off vault, concrete energy dissipation structure, fiber optic and conduit, and directional drilling crossing of the Jordan River with three separate conduits.